See it before you build it
Ted's front entrance stairs visualized in 3D before construction begins at 26 Mac Carl Crescent.



Prepared for Ted by Taishan Construction
Front entrance stair refresh,
designed before construction begins.
Private proposal
Prepared for Ted at 26 Mac Carl Crescent. Pricing is currently being finalized for this stair refresh — all selections will update once the full investment is ready by 3PM August 14th.

3D visualization
Front entrance stairs, landing and approach — visualized before construction begins. More visualizations coming shortly.
Project approach
A disciplined sequence from mobilization to turnover, coordinated with Ted.
Ted's front entrance stairs visualized in 3D before construction begins at 26 Mac Carl Crescent.
Proper substrate prep, material selection and clean detailing beneath every tread, riser and landing.
Each service is presented as a complete lump sum, so Ted knows exactly what is included before we mobilize.
Tread and riser finish, landing edges and approach details inspected, deficiencies corrected and a final walkthrough completed with Ted.
Scope of work
Pricing is being finalized for this stair refresh. All selections will update once the full investment is ready by 3PM August 14th. Estimated 2 – 3 day construction schedule.
Stair refresh
Front entrance stair refresh at 26 Mac Carl Crescent. Pricing and final material selections are being prepared and will be added here once confirmed.
Protection of the entrance and adjacent surfaces, followed by controlled removal or surface prep of the existing stair finish as required for the selected refresh.
Investment summary
Every service is presented as a complete lump-sum investment covering all labour, materials, equipment, disposal and cleanup required for that portion of the work.
Quantities are preliminary and subject to field verification, approved material selections, site access, utility conditions, and confirmation by Ted.
Construction sequence
Under normal site, weather, access, and material-delivery conditions.
Site protection, access setup and controlled removal or prep of the existing stair finish.
Install selected tread and riser finishes with clean detailing at landings, returns and edges.
Pressure wash finished surfaces, remove all debris and complete a final walkthrough with Ted.
Review and confirmation
Please review the stair refresh scope above. Pricing is being finalized and will be added here by 3PM August 14th. Once the investment is ready, Ted can reserve the project or request revisions.
Note: All quantities, material selections and site conditions are preliminary and subject to field verification and confirmation by Ted.
Questions? Contact Jeff directly.