Taishan Construction gold mountain mark
TAISHANCONSTRUCTION
Prepared forTed
ProjectStair Refresh — 26 Mac Carl Crescent
ProposalTS-2026-MACCARL-26
Scope for pricing26 Mac Carl Crescent, Toronto, Ontario
Drawing: Stair Refresh Preview
Entrance Detail — 26 Mac Carl CrescentStreet Perspective — 26 Mac Carl Crescent

Prepared for Ted by Taishan Construction

Stair Refresh — 26 Mac Carl Crescent

Front entrance stair refresh,
designed before construction begins.

26 Mac Carl Crescent, Toronto, OntarioPrepared todayMore visualizations coming shortly

Private proposal

Prepared exclusively for this project.

Prepared for Ted at 26 Mac Carl Crescent. Pricing is currently being finalized for this stair refresh — all selections will update once the full investment is ready by 3PM August 14th.

Taishan Construction gold mountain mark
TAISHANDesign-First Exterior Transformation
Proposal statusDesign Review
Prepared forTed
Prepared byTaishan Construction
Site address26 Mac Carl Crescent, Toronto, Ontario
ReferenceStair Refresh Preview
Stair areaFront entrance stairs & landing
ScopeStair refresh
Renders included2 visualizations
Estimated duration2 – 3 days
Last checkedChecking secure access…
Proposal IDTS-2026-MACCARL-26
Project totalAwaiting all pricing
VersionV1 — Stair Refresh Preview

3D visualization

See it before you build it.

Front entrance stairs, landing and approach — visualized before construction begins. More visualizations coming shortly.

Project approach

How Taishan Construction delivers this scope.

A disciplined sequence from mobilization to turnover, coordinated with Ted.

01

See it before you build it

Ted's front entrance stairs visualized in 3D before construction begins at 26 Mac Carl Crescent.

02

Built properly beneath the surface

Proper substrate prep, material selection and clean detailing beneath every tread, riser and landing.

03

Clear scope, clean execution

Each service is presented as a complete lump sum, so Ted knows exactly what is included before we mobilize.

04

Inspected and turned over

Tread and riser finish, landing edges and approach details inspected, deficiencies corrected and a final walkthrough completed with Ted.

Scope of work

Build your project scope.

Pricing is being finalized for this stair refresh. All selections will update once the full investment is ready by 3PM August 14th. Estimated 2 – 3 day construction schedule.

Stair refresh

Stair refresh.

Front entrance stair refresh at 26 Mac Carl Crescent. Pricing and final material selections are being prepared and will be added here once confirmed.

Protection of the entrance and adjacent surfaces, followed by controlled removal or surface prep of the existing stair finish as required for the selected refresh.

  • Site protection for the entrance, porch and adjacent surfaces
  • Controlled removal or prep of existing stair finish
  • Substrate inspection and repair recommendations
  • Material haul-away and daily tidy-up

Investment summary

Investment summary.

Every service is presented as a complete lump-sum investment covering all labour, materials, equipment, disposal and cleanup required for that portion of the work.

Quantities are preliminary and subject to field verification, approved material selections, site access, utility conditions, and confirmation by Ted.

Project total — selected services Awaiting all pricingFinal pricing ready by 3PM August 14th · more visualizations coming shortly
Stair Demolition & Prep$0.00Tread & Riser Refinishing$0.00Landing & Approach Detailing$0.00Site Protection and Final Cleanup$0.00

Construction sequence

A 2 – 3 day construction schedule.

Under normal site, weather, access, and material-delivery conditions.

DAY01

Mobilization and Prep

Site protection, access setup and controlled removal or prep of the existing stair finish.

DAY02

Tread, Riser & Landing Installation

Install selected tread and riser finishes with clean detailing at landings, returns and edges.

DAY03

Cleanup & Walkthrough

Pressure wash finished surfaces, remove all debris and complete a final walkthrough with Ted.

Review and confirmation

Scope review
with Ted

Please review the stair refresh scope above. Pricing is being finalized and will be added here by 3PM August 14th. Once the investment is ready, Ted can reserve the project or request revisions.

Note: All quantities, material selections and site conditions are preliminary and subject to field verification and confirmation by Ted.

Questions? Contact Jeff directly.
Stair areaFront entrance stairs & landing
ScopeStair refresh
RestorationSite protection and final cleanup
Estimated duration2 – 3 working days
ReferenceStair Refresh Preview
ScopeStair Refresh
Project total Awaiting all pricing
Designs ready3PM August 14th
Estimated startTo be confirmed